[vc_row][vc_column][vc_column_text]

Return to All Posts

[/vc_column_text][vc_column_text]

Original Post:

Posted on March 23, 2016 I ALWAYS HAVE A “TEAR DOWN PILE” GOING IN MY SHOP. I WAIT TILL I HAVE 3-5 HOURS OF BLASTING TILL I MAKE THE 30 RIDE UP TO MY BLASTER, WHERE I USUALLY GET NEXT DAY SERVICE. AS YOU CAN SEE FROM THE PHOTOS I WIRE THE BOLTS SO THEY GO ALONG FOR THE RIDE. I WIRE BRUSH THE BOLT TIPS AND SCREW ON THE NUTS BY HAND, TILL THE ARE TIGHT. I BUNDLE SMALL PARTS OF A TROLLEY TO HELP KEEP THE LOAD ORGANIZED. A TYPICAL LOAD HAS 10-12 TROLLEYS, 2-4 SEATS, A WINDMILL WEIGHT, DRILL ENDS, AND A BUNCH OF BRACKS. I AIR BLOW ALL THE ITEMS BEFORE BRINGING IN TO MY SHOP, AND THEN THE 8-10 DAYS OF PAINTING STARTS.IMG_0247WEB.jpg
IMG_0252WEB.jpg
IMG_0146WEB.jpg
IMG_0148WEB.jpg
IMG_0151web.jpg
IMG_0146WEB-1.jpg
IMG_0153WEB.jpg
Steve[/vc_column_text][/vc_column][/vc_row]